Life-threatening emergencies on the river:
Call 999 and ask for the Coastguard
For near miss, safety observations and incident reporting click below
Notice Ref | L67-25 |
Issuer | Michael Spice |
Issuer Role | Deputy Harbour Master |
Issue Date | 09/09/2025 |
Expiration Date | 22/09/2025 |
District | Lower |
Reach(es) | Gravesend Reach to Northfleet Hope |
On or around 8th September, dredging operations will be undertaken at Tilbury Lock Entrance and CMAT. Works are expected to take approximately 2-3 weeks.
Vessels involved in operations will include “AQUADELTA” and “BORR”, with vessels undertaking Water Injection Dredging on the ebb tide only.
The general location of the works is indicated by the red box on the chartlet below:
CMAT
Tilbury Lock Entrance
Requirements to proceed with caution or at slow speed will be made in accordance with the procedure set out in the Port of London Authority’s Port Information Guide, under ‘Speed Reductions’.
The vessel is required to display lights and signals as per the International Regulations for Preventing Collisions at Sea and maintain a listening watch on VHF channel 68.
For the latest information, contact London VTS on VHF channel 68 or telephone 01474 562215.
Last updated: 2025-09-17 20:15:25